S1E12-transformed

Never Ending Boat Projects: Pulling BOTH Engines, Ripping Off Flexiteek & Full Deck Refit! S1|E12

In this episode we tackle three MASSIVE jobs on our 42-ft catamaran Nyango while in Guatemala: Pulling and completely overhauling BOTH diesel engines with the help of awesome local Guatemalan mechanics. Ripping off all the old Flexiteek synthetic teak decking, Grinding the decks, building and installing brand-new non-skid, and re-gelcoating the entire deck for a factory-fresh look.

No comments yet.

Leave a Reply